Architect: Skope
Client: Axa
Location: Brussels
Surface: between 25.000 and 40.000 m²
Timing: 2016 - 2017
Budget: between € 25.000.000 and 60.000.000
Status: realized
Technical advice I Feasibility study
Technical feasibility study for the renovation and redesign of the CCN offices next to the North station in Brussels.
Bureau Bouwtechniek works on four scenarios ranging from the least to the most radical. With this report, the client can consider renovation strategies according to his priorities.
The scenarios range from 25,000 m² to 40,000 m² and the budgets vary between EUR 25 million and EUR 60 million depending on the chosen renovation strategy.
The following parameters were considered:
- costs thermal insulation / EPB
- energy consumption
- daylight
- special techniques
- acoustics
- fire
- organization of offices per level
- architectural interventions.
Team BB: arch. Francesca Crosby, arch. Mark Sette, ir. arch. Nadja Van Houten, arch. Barbara Arts, ir. arch. Paulus Present