Cultural Factory Izegem

Architect: BeL Sozietät für Architektur with Bureau Bouwtechniek
Client: Stadsbestuur Izegem
Advisors: Mouton (stability), HP Engineers (technieques), Bureau Bouwtechniek (EPB), Daidalos Peutz (acoustics)
Location: Izegem
Timing: 2020 - 
Budget: € 13.500.000 
Status: design phase

© BeL Sozietät für Architektur

Project support I Collaboration
Technical advice I EPR 
& Safety coordination

Re-use and extension of the old Strobbe printing house into an integrated leisure centre in Izegem. The public library, Art'IZ art academy and the city archives of Izegem are combined into a new cultural centre housed in the "Strobbe" printing house in the heart of Izegem. 

Bureau Bouwtechniek
BB is responsible for providing the architects with full technical support during the design process, the submission of the environmental permit, the drawing up of the implementation plans, the development of technical details, the drawing up of the building specifications and the estimate. BB supervises the execution and is EPB reporter.

Team BB: arch. Lieselot Prinsie, ir. arch. Jan-Hendrik Beckx, ir. arch. Jona Van Steenkiste