Architect: HUB
Client: Art Basics for Children asbl
Advisors: BAS (stability)
Location: Schaarbeek
Surface: 1.725 m²
Timing:
Phase 1: 2007 - 2008
Phase 2: 2013 - 2016
Status: realized
© Ilse Liekens, Sarah Blee
Project Support I Collaboration
Technical advice I Installation-technical advice
Technical advice I Safety coordination
Phase 1: Renovation of youth house The Factory into a multifunctional and artistic lab. This new home base for Art Basics for Children (ABC) is a laboratory with research and development office facilities in the field of art experience and aesthetic education for children.
Phase 2: Extension of the infrastructure with a new building.
This new building includes a lab class that can be used in different ways. On the first floor, this new space offers room for silence and movement.
Bureau Bouwtechniek is responsible for the complete construction-technical support of HUB from the tendering phase. BB is responsible for technical assistance during the design process, the layout of the implementation plans, the blueprint of constructional specifications and estimates. BB leads the monitoring of the execution.
Bureau Bouwtechniek provides technical installation advice and safety coordination.
Team BB: ir. arch. Gert Biebauw, ing. Martijn Vyncke, arch. ass. Ken Coolsaet, ir. arch. Jona Van Steenkiste