Media building VRT

Architect: TBM Robbrecht en Daem – Dierendonckblancke – VK – Arup
Client: VRT 
Advisors: Bureau Bas Smets (landschapsontwerp), Muller Van Severen (interieurontwerp), VK Engineering en Arup and Partners International Ltd (stabiliteit, akoestiek, technieken), Sweco Belgium nv (veiligheidscoördinatie) 
Location: Brussel 
Surface: 55.000 m² 
Budget: € 105.000.000 
Timing: 2017 -  
Status: design phase

Images: TBM Robbrecht en Daem – Dierendonckblancke – VK – Arup / Filip Dujardin

Project support I Collaboration

Bureau Bouwtechniek is responsible for the complete construction-technical support of the design team since the tendering phase. 

BB is responsible for the execution of the technnical details, the layout of the tender documents, the project planning. BB leads the monitoring of the implementation.

Team BB: arch. Lieselot Prinsie, arch. Raf De Preter, ir. arch. Thomas Cantraine, arch. Michaël De Roeck, arch. Sebastian De Meyere, ir. arch. Karen Josso, ing. Julie Huybrigh